You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Air Jalan Laksana Kartini Dinormalisasi

Channels on Jalan Laksana Kartini Normalized

Water channels are normalized in settlements on Jalan Laksana, RW 06 and 07 Kartini, Sawah Besar, Central Jakarta.

Hopefully, water flow can run smoothly thus RW 06 and 07 will be not inundated again

Normalization is done to follow up local resident's request through Musrenbang 2017.

Jalan Petojo VII Cideng's Water Channel Dredged

"Hopefully, water flow can run smoothly thus RW 06 and 07 will be not inundated again," said Abraham Samuel, Kartini Urban Village Head, Friday (9/21).

Meanwhile, Central Jakarta Water Resources (SDA) Sub-dept.'s Development Section Head, Fajar Avisena stated, normalization is done by dredging mud and replacing driveway. This normalization is targeted to complete by end of November 2018.

"We are dredging two channels. Channel at RW 06 has 140 meters long and flows to Kartini PHB Channel. While channel at RW 07 has 334 meters long and located between two roads," he informed.

His side also installs U-Ditch on the channel to prevent it from collapsing and narrowing.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1100 personFakhrizal Fakhri
  2. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye638 personBudhi Firmansyah Surapati
  3. Still Rp 3,500! No Fare Change for Transjakarta’s Kalideres–Soetta Route

    access_time01-08-2026 remove_red_eye545 personAldi Geri Lumban Tobing
  4. Jakarta Reaffirms Commitment to Preserving Cultural Heritage

    access_time31-07-2026 remove_red_eye523 personDessy Suciati
  5. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye511 personTiyo Surya Sakti