You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran Air Jalan Laksana Kartini Dinormalisasi
.
photo Suparni - Beritajakarta.id

Channels on Jalan Laksana Kartini Normalized

Water channels are normalized in settlements on Jalan Laksana, RW 06 and 07 Kartini, Sawah Besar, Central Jakarta.

Hopefully, water flow can run smoothly thus RW 06 and 07 will be not inundated again

Normalization is done to follow up local resident's request through Musrenbang 2017.

Jalan Petojo VII Cideng's Water Channel Dredged

"Hopefully, water flow can run smoothly thus RW 06 and 07 will be not inundated again," said Abraham Samuel, Kartini Urban Village Head, Friday (9/21).

Meanwhile, Central Jakarta Water Resources (SDA) Sub-dept.'s Development Section Head, Fajar Avisena stated, normalization is done by dredging mud and replacing driveway. This normalization is targeted to complete by end of November 2018.

"We are dredging two channels. Channel at RW 06 has 140 meters long and flows to Kartini PHB Channel. While channel at RW 07 has 334 meters long and located between two roads," he informed.

His side also installs U-Ditch on the channel to prevent it from collapsing and narrowing.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1151 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye848 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye781 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye759 personAldi Geri Lumban Tobing